Date: 
Thursday, January 24, 2019
  1. Haslington Pump Station – Flushout #4 (Golden Grove Market Rd. – North East) and Flushout #6 (Golden Grove market road – South East) need extensions to the discharge pipe upward from the drain. Flushout #8 (Golden Grove North East) need to be cleared of dirt.
  2. Victoria Pump Station – Flushout #1 (Cove and John Police Station Compound), Flushout #2 (Street next to Cove and John Police Station) and Flushout #3 (Cove and John South) need to be located and cleared of dirt. Flushout valves are to be installed at Northern and Eastern sections of Cove and John Village. Flushout #4 (Victoria Seawall) need extension. Flushout #6 (Victoria South East of Gas Station Rd.) valve tube need to be cleaned and flush.
  3. Lowland Pump Station – Flushout #1 (Nootenzuil public rd. North) require repairs and elevation. Flushout #2 (Nootenzuil Seawall) Flushout #3 (Nootenzuil South- next to masjid) and Flushout #9 (Hope public Rd. North – By Hope Sec. School) need extensions to the discharge pipe. Flushout #7 (Hope backlands) and Flushout #8 (Hope public rd. South) need to be cleared of dirt.
  4. Clonbrook Pump Station – Flushout #5 (Ann’s Grove backlands South), Flushout #7 (Clonbrook East) and Flushout #9 (Bee Hive North) need to be cleared of dirt and bushes. Flushout #6 (Ann’s Grove backlands – South West area) valve need to be repaired and protected from vandalism. Flushout #10 (Bee Hive North West area) valve need to be repaired and service.
  5. Unity Pump Station – Flushout #1 (Unity Public rd. North Old bridge), Flushout #2 (Unity Public rd. South Old bridge), Flushout #4 (Unity foreshore – North East), Flushout #6 (Unity old rd.) and Flushout #7 (Unity Backlands) discharge pipe need extension.

Proper maintenance, labelling and protection is warranted for all valves and discharge pipes. A schedule for flushout should be created and adhered to for consistency.